When repairing a bathroom or kitchen, there is often a need to create drywall structures and put a tile on them. Find out more about this on thematic network projects or you can consult with specialists who are permanent engaged in such work.
Today, tiles presented in various modifications are considered the best option from varieties of finishing materials and will be in demand for work in such specific rooms as a bathroom, toilet and kitchen. There are models for the floor and wall -mounted installation option, and they will differ among themselves, therefore it is necessary to competently make the corresponding choice. On this issue, additional information can be found on the network.
If you should look at the drywall leaf, it becomes clear why this design is considered one of the most acceptable for use today. The material itself will be natural in origin and is considered truly in demand among those who have a desire to make the premises beautiful and practical. When attaching to this surface of this material, it will be necessary to observe certain rules and use a special adhesive composition. The main difficulty will be that the adhesive base can cause bending or other deformation of the drywall sheet.
You can avoid such a trouble, which is worth learning in more detail. To begin with, it is recommended to install the guide elements with a special variety, and between them it is recommended to make a distance of forty to fifty centimeters, but for a thin sheet this distance should be significantly reduced. With such installation, it will be necessary to organize a plaster mesh. Fastening to the canvas will be made on the basis of the use of PVA, and the use of a special grid is the use of insurance, and the mount will be made by special boxes. The surface of the sheet will need to be primed, which is performed before the main laying of the tile.
The composition for the work on priming will need to be applied several times using a gear model of a scraper. Depending on the methodology used, the composition is not applied thirty – sixty minutes. After the tile is laid on the base according to the selected methodology.