Any thorough apartment renovation is inextricably linked with noisy work. These include work on the redevelopment of the premises when the existing partitions and other structural elements are dismantled, laundering with the help of a barborer of furrows in the thickness of the walls for laying cables and other communications later.
As well as the device of the suspended ceiling, preparation on the surface of the floor of the base for further laying parquet or other flooring. Of course, the owners of the repair room, not wanting to breathe dust and put up with constant noise, can take advantage of the proposal about the opportunity to rent a room in a communal apartment or any other housing. But in order not to spoil the repair of relations with neighbors, you should adhere to certain rules.
As for the day and night levels of noise, the noise at night is classified as a violation of public order. In addition, sanitary standards provide the limit values of noise levels for residential premises: – maximum sound levels in the daytime – 55 dBA (acoustic decibel) and, respectively, 45 dBA into the night; – equivalent levels of sound 40dba in the daytime and 30dba in the night.
Work related to the reconstruction of the premises is strictly forbidden to carry out on Sundays and holidays.
Also, work accompanied by an increase in the noise level is not carried out earlier than 9 a.m.
It is strictly forbidden to squeeze or pollute with construction waste or materials of public use and evacuation tracks. The total duration of the repair work should not exceed 4 months. Otherwise, in cases of a systematic violation of public order, the law authorizes residents draw up complaints and send them to the police, housing inspections, prosecutor’s office, fire and sanitary-epidemiological supervision services.