In order for the interior door to serve for a long time, preserving the initial attractive appearance and operational characteristics, and organically fit into the interior of the room, it is necessary to follow certain installation rules.
Checking the product and doorway
Before starting the installation, you need to verify the possibility of installing the structure in the prepared doorway and check the quality of the canvas. If it has damage or does not correspond to the declared dimensions, you should not proceed to the assembly.
Professionals begin to install doors, arranging them on the openings. At this stage, the equipment is checked: the presence of additional elements, fittings, platbands, etc. D. Then the places of locking locks and sample are marked under the loops.
Installation of loops and locks
To mark the markup, you need a pencil, a square and roulette. For uniform selection of wood under the loops, professional installers use a milling mill. To some models of this tool, you can connect a vacuum cleaner to collect sawdust and chips. After the operation is completed, the loop is inserted into the prepared place and fixed with screws.
To install locks and latches, it is necessary to select quite deep and wide holes, so a special accuracy is needed here. For work, feathers, drill, milling cutter or chisel are used to perform work. First, marking is applied, after which holes under the handles are drilled (this must be done on both sides so as not to damage the cover of the canvas) and the cavity is selected for the lock. The prepared holes must be cleaned of sawdust, as they can damage the lock mechanism.
Assembly of the box
This is the most difficult and responsible stage. Modern manufacturers produce products of complex section, which are assembled using the usual connection. It is most convenient to use the end saw. With its help, the racks are drained at an angle of 45 °. After that, the upper crossbar is prepared. The width of the canvas is preliminarily measured, to which the width of the gaps is added to the right and on the left. After that, the crossbar is washed down under 45 °. The racks are marked and washed down in height, taking into account the gap between the floor and the door leaf. Then the gearbox is assembled, for this, the corresponding surface of the racks and crossbars are combined and sew them with three self -tapping screws. At the end, the correct assembly is checked – the canvas is put into the assembled box.
Installation of the box
It is necessary to insert the box into the opening and fix it there with the help of wedges (tolerate). First of all, a stand with loops is set: it must be put vertically both in the plane of the wall and in the plane of the canvas of the canvas, and then fix at least two points. To perform this operation, fasteners, drill, drill, punch, screwdriver are needed. After that, the canvas is hung on the hinges to evaluate the correct installation and begin to prepare the return rack.
The retaliatory rack is marked and selected under the response bar. Then it is set so that the door leaf over the entire height tightly adjacent to the seal. The stand is attached to the opening at the place of attachment of the response bar, as well as from above and below. To increase noise absorption, the gaps between the box and the opening are disconnected.
Parting of the opening
The design of the opening closes the mounting seam and gives the design a complete view. To do this, most often use platbands that are written out in size and attached to a special groove. It should be borne in mind that different types of products are recorded at different angles (45 or 90 °).