Actually, the results of measurements without their processing during the construction of engineering structures in sliding formwork serve only auxiliary data on the forming changes and size of formwork during concreting.
Their main purpose is to create the basis for the management of the formwork movement. Therefore, the resulting measurement results at the planned formwork must use purposefully. To manage the construction using this method, it is necessary to quickly obtain reliable data to adjust the movement of formwork without stopping the production of concreting.
This is all the more necessary, since the measurements during the movement of the formwork cause significant costs, which only are fully justified when construction is carried out with increased accuracy. The measurement results and their assessment should be presented in the form of tables and graphs.
When erecting buildings and structures in sliding formwork, a strict connection should always take place between the processes of geodetic measurements, evaluate the results of measurements and adjusting the movement of formwork. Increasing the accuracy of construction with this method can only be achieved thanks to the reliable functioning of the above comprehensive system.